CFA Building L - Art workshops
Digital Classroom, Media Lab and Drawing
Studio
Project Manager:
Roseann Sillasen
Architect: Tai Soo Kim
Partners
Contractor:
Aresco Construction at joearesco@sbcglobal.net
The Arts Teaching Spaces CFA Building L project is
envisioned to continue to improve the campus life through supporting facilities
and to maintain and improve the physical and technological infrastructure.
The Arts Teaching Spaces CFA Building L project shall
include but not be limited to the renovation of the first floor of the Center
for the Arts Building L. This project will accommodate the needs of the Arts
faculty by creating a digital classroom, media lab, editing rooms, drawing
studio, 1 drawing faculty office with studio space, 1 ITS support office,
plotter/storage workroom, drawing studio storage room and PC Kiosk/portfolio
storage area. Supplemental cooling will be provided in the digital classroom
and media lab. Exhaust units will be provided in the drawing studio and
plotter/storage area and ventilation will be provided in the editing rooms.
Demolition to include but not be limited to removal of wiremold, lighting,
electrical and subpanels, removal and relocation of drawing studio grid lighting
system and related dimming system, relocation of fire alarm devices, cleaning
and painting of existing roof drains, removal of corridor slop sink and water
fountain, cap of existing plumbing supplies as identified, demolition of
corridor storage areas, removal and reuse of interior doors, removal and
disposal of window treatment, roof openings to accommodate 2 air conditions and
exhaust units for medial lab and digital classroom, drawing studio and editing
rooms. Relocation and installation of additional smoke detectors and horn
strobes as required, maintenance to 18 existing FCU to include replacement of
valves with Belimo 3-way valves interfaced with the Energy Management System.
Installation of black out and light filtering shades as indicated on the
drawings. Furnished and built in workstations to accommodate classroom, lab,
offices and studio. Relocation and reinstallation of drawing studio equipment,
still life samples, cabinetry, platform, lighting grid and related items.
Signage as identified. Carpeting to be installed in ITS office, media lab,
plotter/storage room, and editing rooms. New wood dance floor in digital
classroom. New paint throughout. Lighting to be addressed in each space. Tack
boards to be provided in classroom, lab, and drawing studio. Restoration and
reuse of existing tack board in main corridor and drawing office. Projection
screen installation and utilities/conduit for ITS rack system and security
system. Installation of ceiling mounted projectors in classroom and media lab.
Installation of new electrical panel. Related work as identified on the
drawings and in the specifications.


|
|