Go to Wesleyan Homepage Go to Navigation Menu Go to Directories Go to Events Calendar Go to Search Wesleyan Go to Portfolio Sign-in

 
NEWSLETTER HOME
ARCHIVES
E-MAIL US
 
 
   
 
ARTS INFORMATION
SPORTS INFORMATION
WESLEYAN MAGAZINE
WESLEYAN IN THE NEWS
WESLEYAN CLASSIFIEDS
 
 
   
 
MORE SNAPSHOTS
 
     

IN NEED OF A GOOD DUSTING: Contractors sandblast newly-set cement between the west-backside of North and South College. The pathways lead to the new Suzanne Lemberg Usdan University Center. The purpose is to emulate the surface appearance of worn concrete.

A dust cloud covered the buildings' back side on June 14. The concrete was placed on a specially prepared base of crushed stone. In between the sidewalks will be a sandy-loam and organic soil mixture used to grow trees. (Photos by Olivia Bartlett)