Major Maintenance Classroom Maintenance

Scheduled for May 30 - June 20, 2006

Sequence #66

Building

Room #

Description of Work

#208

 

 

Public Affairs Center

PAC 421

Patch plaster at northwest corner of wall.  Paint north and west walls and trim.

Clean carpet by extraction method.

Refinish seminar room table.

Increase lighting. Install 4 additional ceiling fixtures. Zone switching.

 

PAC136

Paint walls, trim, door and frame. Match existing color scheme.

 

PAC125

Paint walls, trim, door and frame. Match existing color scheme.

 

PAC104

Paint walls, trim, door and frame. Match existing color scheme.

 

PAC411

Increase lighting. Install 4 additional ceiling fixtures. Zone switching.

 

PAC001

Clean carpet by extraction method.

Repair mechanical mecco shades.

Fisk Hall

Fisk 115

Replace all discolored ceiling tiles with matching ceiling tile profile.

 

Fisk 114

Replace all discolored ceiling tiles with matching ceiling tile profile

 

Fisk 116

Paint walls, trim, door and frame. Match existing color scheme.

 

FISK312

Replace all discolored ceiling tiles with matching ceiling tile profile

Science Center

SC137

Clean carpet by extraction method.

Zone existing fluorescent lighting to 2 zones. Provide switching at front of room.

 

SC139

Clean carpet by extraction method.

Zone existing fluorescent lighting to 2 zones. Provide switching at front of room.

 

SC141

Clean carpet by extraction method.

Zone existing fluorescent lighting to 2 zones. Provide switching at front of room.

 

SC121

Reinstall tablet arm chairs. Secure to floor. Provide new floor bolts.

 

SC109

Clean carpet by extraction method.

 

SC58

Clean carpet by extraction method.  Replace bleached areas if unable to clean satisfactorily.

Shanklin Hall

SHAN107

Clean carpet by extraction method.

Hall-Atwater

HA84

Clean carpet by extraction method.

Butterfield A

Butt A413

Install ceiling tile (1 missing)

Butterfield C

Butt C314

Replace discolored ceiling tiles. Paint walls, trim, doors.

 

 

 

#66

 

 

Center for the Arts

 

 

Dance Studios

East Room

Install electrical for new a/v installation.

Repair room filtering shade.

Paint all surfaces; walls, window and door trim, doors, FCUs.

Refinish wood floor.

 

001

Install electrical for new a/v installation.

Paint all surfaces; walls, door trim, doors, etc.

Refinish wood floor.

Install new entry doors with lites.

 

ELECTRICAL

Science Center Rooms 137, 139 and 141: Create 2 zones for 1x4 fluorescent light fixtures.

Provide electrical supply for a/v installations in Center for the Arts classrooms.