Building Name |
Building Address |
Proposed Maintenance |
Building Use |
Summer Schedule |
|
Admissions |
70 Wyllys Ave |
First floor mens and womens rooms. Replace counter with solid surface
counter. Replace floor material. |
ADM |
March 10-March 27, 2006 |
|
Butterfield A |
Lawn Ave |
Install Magnetic hold open devices on all stairwell doors |
SLF |
May 30 - June 20, 2006 |
|
Butterfield A B C |
Lawn / Huber |
Install security card access control system (Need to upgrade existing
system. Parts are now obsolete.) |
SLF |
May 30 - June 20, 2006 |
|
Butterfield B |
Huber Ave |
Rebuild 2 fire escape landings |
SLF |
May 30 - June 20, 2006 |
|
Butterfield C - College of Letters |
Huber Ave |
Water comes into Room C313 every year with rains and with melting snow in
the Spring. Please assess and repair. |
ACAD |
May 30 - June 20, 2006 |
|
Cady Building |
170 Long Lane |
Install basement HVAC. Existing natural ventilation is inadequate to control
humidity, will corrode valuable shop machinery, computers, slip hazard to
employees during high humidity conditions, potential source of mold growth |
ADM |
Currently ongoing |
|
Campus Classrooms |
Campus wide |
Renovate classrooms not included in classroom initiative project. Phased
over 10 years. Year 1 of 10 |
ACAD |
May 30 - June 20, 2006 |
|
Campus Roofs |
Campus wide |
Provide roofing survey and maintenance plan for all campus roofs. Uilize
housing survey for woodframes. |
INFRA |
May 30 - August 18, 2006 |
|
Campus Wide |
Campus wide |
Placeholder to address areas of concern by students on tour. |
SLF |
May 30 - August 18, 2006 |
|
Campus Wide |
Campus wide |
Add blue phones in areas identified by URLC. (2-3 locations) Coordinate with
URLC |
SLF |
May 30 - August 18, 2006 |
|
CFA |
283 Washington Terr |
Improve exterior lighting. Insufficient light exists. Safety concerns with
dark entrances. Improve exterior lighting to performing venues. |
ACAD |
May 30 - August 18, 2006 |
|
CFA A/Rehearsal Hall |
283 Washington Terr |
Replace Fire Alarm System. Connect to master panel. |
ACAD |
May 30 - June 20 and July 31 - August 18, 2006 if needed |
|
CFA A/Rehearsal Hall & F/Music Studios |
283 Washington Terr |
Explore air quality complaints in Rehearsal Hall and Music Studios. |
ACAD |
ongoing |
|
CFA C/World Music |
283 Washington Terr |
Upgrade mech system and windows to provide humidity control. Silence air
handlers. New equipment to be placed on roof. |
ACAD |
Deferred to Summer 2007 |
|
CFA C/World Music |
283 Washington Terr |
Replace existing parquet wood flooring in World Music Hall. |
ACAD |
May 30 - June 20, 2006 |
|
CFA F/Music Studios |
283 Washington Terr |
Replace Lighting with energy efficient CFA standard lighting. |
ACAD |
May 30 - June 20 and July 31 - August 18, 2006 if needed |
|
CFA J/Cinema, L/Art Workshops, M/Zilkha |
CFA J/Cinema, L/Art Workshops, M/Zilkha |
Clean/repoint/waterproof exterior of buildings (South side of CFA L
completed Summer 05. East, West and North sides remaining.) |
ACAD |
May 30 - August 18, 2006 |
|
CFA M/Zilkha |
283 Washington Terr |
Replace AHU 1 |
ACAD |
|
|
CFA M/Zilkha |
283 Washington Terr |
Replace existing water cooled AC 1 in vault with air cooled unit |
ACAD |
May 30 - August 18, 2006 |
|
CFA M/Zilkha |
283 Washington Terr |
Replace Lighting in 2nd floor offices with energy efficient CFA standard
lighting. |
ACAD |
May 30 - August 18, 2006 |
|
CFA P/Theater |
283 Washington Terr |
Complete handrail maintenance in Theater. Sample steel handrail installed on
mezzanine level during MM02/03. |
ACAD |
May 30 - June 20, 2006 |
|
CFA P/Theater |
283 Washington Terr |
Install dehumidification to eliminate mold throughout space and within
costume storage that exists within these areas. This will provide additional
places to move endangered stock from hallway. |
ACAD |
Currently May 30 - August 18, 2006 |
|
CFA P/Theater |
283 Washington Terr |
Replace Lighting with energy efficient CFA standard lighting. |
ACAD |
Currently May 30 - June 20, 2006 |
|
CFA R/Dance |
283 Washington Terr |
Clean and repair ductwork in Dance Studio 001. |
ACAD |
May 30 - June 20, 2006 |
|
Chapel Theater |
High St. |
Install security card access control system |
ACAD |
ongoing |
|
Chilled Water Loop |
Campus Wide |
Reengineer set points and control sequence. Balance loop |
INFRA |
ongoing |
|
CPP |
280 William Street |
Clean boilers and economizer |
INFRA |
ongoing |
|
CPP |
280 William Street |
Replace main relief valve on low pressure steam supply |
INFRA |
ongoing |
|
CPP |
280 William Street |
Replace a/c unit in CPP that cools art transformer vault with air cooled
unit. |
INFRA |
ongoing |
|
CPP |
280 William Street |
Add platform and railings around cooling tower |
INFRA |
ongoing |
|
CPP |
280 William Street |
Install side stream filtration on condenser water |
INFRA |
ongoing |
|
CPP |
280 William Street |
Replace below grade elbow on stack 3 |
INFRA |
ongoing |
|
Davison Art Center |
301 High St |
Obtain structural engineering report to repair enclosed skylight,
surrounding framing and paint ceiling. Unit is in severe need of attention. |
ACAD |
To be scheduled with DAC |
|
Davison Health Center-Infirmary |
High St. |
Replace all hallway vinyl flooring with new. |
ADM |
June 26 - July 14, 2006 |
|
Davison Health Center-Infirmary |
High St. |
Stairwell handrail is below code requirements. Modify/install new to code. |
ADM |
June 26 - July 14, 2006 |
|
East Asian Studies |
343 Washington Terr |
Remove and reconstruct front stairs to northeast entrance on Washington
Terrace. |
ACAD |
Currently May 30 - August 18, 2006 |
|
Faculty |
12-14 Knowles Avenue |
Replace roof. Install new gutters and leaders with cleanouts. |
RP |
Rental Properties |
|
Faculty |
134 Mt Vernon |
Replace roof, reflash and repoint chimney. |
RP |
Rental Properties |
|
Faculty |
38 Fairview Ave |
Please demo. Roof caved in. Safety issue. |
RP |
Rental Properties |
|
Faculty/Staff |
116 Mt Vernon |
Paint exterior of house trim, shutters, porches,etc. Repairs where needed,
repair shutters, replace rotted wood, soffits, etc. Evaluate cost of siding
as an alternate. |
RP |
Rental Properties |
|
Foss Hill 1 - 10 |
Foss Hill Drive |
Replace Foss hill key system with Peaks proprietary system. Existing dimpled
key system is obsolete, lock system is high maintenance burden, expensive to
replace. New system will move towards standardization plan for the campus
Perform with Foss Reno. |
SLF |
Ongoing through August 25, 2006 |
|
Foss Hill 1-7 & 10 |
Foss Hill Drive |
Install danfoss valves on all heating units. |
SLF |
Ongoing through August 25, 2006 |
|
Foss Hill 5-7 |
Foss Hill Drive |
Install security camera system in rear of building. |
SLF |
Ongoing through August 25, 2006 |
|
Foss Hill Complex |
Foss Hill Drive |
Replace card readers with One Card units. No longer able to repair existing
card reader system. Units are obsolete and parts are not available. Perform
with Foss Renovation |
SLF |
Ongoing through August 25, 2006 |
|
Foss Hill Dorm # 8-10 |
Foss Hill Drive |
Clean brownstone, spot point and replace all caulking on facilities. Perform
with Foss Renovation |
SLF |
Ongoing through August 25, 2006 |
|
Foss Hill Dorm # 8-10 |
Foss Hill Drive |
Scrape and paint all exterior surfaces and paint. Repaint to match existing
building colors. Perform with Foss Renovation |
SLF |
Ongoing through August 25, 2006 |
|
Freeman Athletic Center |
161 Cross St |
Refrigeration compressors have defective oil recovery system. Oil remains in
system, not brought back to compressors under low load conditions. |
ATH |
August 6 - August 20, 2006 |
|
Freeman Athletic Center |
161 Cross Street |
Install locker room exhaust fan systems in men's and ladies locker rooms.
Existing ventilation is inadequate |
ATH |
August 6 - August 20, 2006 |
|
Freeman Athletic Center |
161 Cross Street |
Replace Lighting in Hockey Rink. |
ATH |
August 6 - August 20, 2006 |
|
Freeman Athletic Center |
161 Cross Street |
Remove existing VCT flooring and replace with new VCT flooring. |
ATH |
August 6 - August 20, 2006 |
|
Freeman Athletic Center |
Athletic fields |
Renovate fields (annual field work) |
ATH |
Scheduled with FAC |
|
Graduate |
39 Brainerd Avenue |
Replace roof and chimney flashing. Install new gutters and leaders with
cleanouts. |
RP |
Rental Properties |
|
Graduate |
49 Brainerd Avenue |
Paint exterior of house. Replace front porch and paint. Replace roof and
install gutters. |
RP |
Rental Properties |
|
High Rise |
110 Church St |
Install security card access control system on west entrance door. |
SLF |
complete |
|
High Rise |
Interior Renovations - 8th floor |
Renovate Kitchens and bathrooms in each apartment on the 8th floor.
Renovations include kitchens & bathrooms same scope as Lowrise B, replace
base molding throughout and paint entire unit (ceilings included). Replace
hallway carpeting, paint corridor walls/ceilings, replace common area
lighting |
SLF |
May 30 - August 18, 2006 |
|
Judd Hall |
237 High St |
Rekeying of Judd Hall |
ACAD |
|
|
Non-Traditional Dorm / Program House |
154 Church St - Open House |
Provide new bathrooms and kitchen, plaster, paint interior, exterior siding,
new windows, insulate attic, electrical and mechanical work. Install fire
alarm and sprinkler system. |
SLF |
May 30 - August 18, 2006 |
|
Non-Traditional Dorm / Program House |
156 High |
Install security card access control system |
SLF |
ongoing |
|
Non-Traditional Dorm / Program House |
156 High |
Renovate two bathrooms on 2nd and two bathrooms on 3rd floor. |
SLF |
May 30 - August 18, 2006 |
|
Non-Traditional Dorm / Program House |
157 Church - Bayit |
Renovate two bathrooms on 2nd and two bathrooms on 3rd floor. |
SLF |
May 30 - August 18, 2006 |
|
Non-Traditional Dorm / Program House |
200 Church |
Install security card access control system |
SLF |
ongoing |
|
Non-Traditional Dorm / Program House |
200 High |
Install security card access control system |
SLF |
ongoing |
|
Non-Traditional Dorm / Program House |
202 Washington |
Install security card access control system |
SLF |
ongoing |
|
Non-Traditional Dorm / Program House |
227 Pine St - Women of Color |
Provide new bathrooms and kitchen, plaster repair, paint interior, exterior
siding, new windows, insulate attic, electrical and mechanical work.
Install fire alarm and sprinkler system. |
SLF |
May 30 - August 18, 2006 |
|
Non-Traditional Dorm / Program House |
230 Washington Street |
Install security card access control system |
SLF |
|
|
Non-Traditional Dorm / Program House |
64 Lawn - Sign House |
Renovate kitchen and bathroom. Renovate house. Insulate attic. Install fire
alarm and sprinkler system. |
SLF |
May 30 - August 18, 2006 |
|
Olin Library |
252 Church St |
Stretch existing carpeting to extend life another couple of years. |
ACAD |
Schedule with Library |
|
PAC |
High St |
Replace reheats w/DDC type |
ACAD |
ongoing |
|
Science Center |
265 Church St |
Install security card access control system - Addresses 2-3 doors to secure
late night acces. |
ACAD |
ongoing |
|
Science Center |
265 Church St |
Replace all components of air handler #5. Coils, dampers, valves, related
piping, blowers, motors etc. |
ACAD |
ongoing |
|
Science Center |
265 Church St |
Install shut off valves for gas at professor's stations in SC150 and SC074. |
ACAD |
ongoing |
|
Shanklin Lab |
Church St |
Construct a safe emergency exit from SH107. Life Safety item. Design
required. |
ACAD |
May 30 - August 18, 2006 |
|
Student WF |
105 Cross St. |
Install vinyl siding. Investigate hardiplank as an alternative. Maintain
detail in new trim work. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
107 Cross St. |
Install vinyl siding. Investigate hardiplank as an alternative. Maintain
detail in new trim work. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
109 Cross St. |
Install vinyl siding. Investigate hardiplank as an alternative. Maintain
detail in new trim work. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
131 Cross |
Upgrade electrical service to provide minimum 2 outlets in bedrooms.
Increase outlets in kitchen and common areas. New windows, screens,
insulation, setback t-stats. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
146 High St |
Provide new bathrooms and kitchen, plaster, paint interior, exterior siding,
new windows, insulate attic, electrical and mechanical work. Prior Rental
Properties house turned over to undergrad. Install fire alarm and sprinkler
system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
162 Cross |
Provide new bathrooms and kitchen, plaster, paint interior, exterior siding,
new windows, insulate attic, electrical and mechanical work. Prior Rental
Properties house turned over to undergrad. Install fire alarm and
sprinkler system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
163 Vine St. |
Upgrade electrical system throughout house |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
2 Fountain |
Renovate kitchen |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
21 Vine Street |
Paint exterior. Investigate vinyl siding as an alternate. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
235 Pine |
Renovate bathroom |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
29 Fountain |
Upgrade fire alarm, new bathrooms and kitchen, plaster, paint interior,
exterior siding, insulate attic, new windows, electrical and mechanical
work. Install fire alarm and sprinkler system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
30 Fountain |
Provide new bathrooms and kitchen, plaster, paint interior, exterior siding,
new windows, insulate attic, electrical and mechanical work. Install fire
alarm and sprinkler system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
4 Warren |
Perform interior renovations to better accommodate needs of building. CS to
measure and determine appropriate layout of space. Side Exterior. Upgrade
fire alarm. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
51 Fountain Ave. |
Install new roof, gutters, leaders with cleanouts. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
66 Home Ave |
Kitchen renovation including electrical/GFI. Install fire alarm and
sprinkler system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
80 Lawn Ave |
Provide new bathrooms and kitchen, plaster, paint interior, exterior siding,
new windows, insulate attic, electrical and mechanical work. Prior Rental
Properties house turned over to undergrad. Install fire alarm and sprinkler
system. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
85 Home Ave |
Replace windows. Existing windows are in poor condition, leaky, multiple
storm windows missing. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
85 Home Ave |
Renovate bathroom including electrical. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
9 Huber Avenue |
Install new roof, gutters, leaders with cleanouts. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF |
Campus Wide |
Install 50 preset stats in wood frames |
SLF-WF |
ongoing |
|
Student WF |
Campus wide |
Rekey all woodframe house to ensure safety and consistency across campus.
There are various key systems. Significant labor expense wasted in
maintenance inefficiencies due to various key systems, having to reissue to
students each year. Single standardized system needed to realize cost
savings. Phase over 3 years. Year 1 of 3 |
SLF-WF |
ongoing |
|
Student WF |
Campus wide |
Identify woodframe houses that require plumbing repairs (leaks, uninsulated
pipes, poorly functioning water heaters, etc) Phased project over 5 years.
Year 1 of 5 |
SLF-WF |
ongoing |
|
Student WF |
Campus wide |
Repair/replace plaster ceilings & walls (Allowance) |
SLF-WF |
ongoing |
|
Student WF |
Insulate Attics |
Insulate Attics (2 of 5 year plan @ $120,000/yr) Select housed that are not
approved for total renovation. |
SLF-WF |
ongoing |
|
Student WF |
New Furnaces |
Replace old furnaces in 7-8 houses (Year 2 of 10 year program) Select housed
that are not approved for total renovation. |
SLF-WF |
ongoing |
|
Student WF |
New Windows |
Replace old windows w/energy efficient windows and full screens (Year 2 of
7) Select housed that are not approved for total renovation. |
SLF-WF |
ongoing |
|
Student WF |
Pine Street |
Misc. Village concept area painting. Install siding on 265, 269, 273, 277
Pine St. Investigate hardiplank as an alternative. Maintain detail in new
trim work. |
SLF-WF |
May 30 - August 18, 2006 |
|
Student WF/Grad |
Campus wide |
Install carbon monoxide detectors in all undergraduate houses. Detectors to
be AC or DC power based on availability of receptacle. (2 per house) |
SLF-WF |
ongoing |
|
Classroom Initiative Classrooms |
Campus Wide |
Perform maintenance to identified classrooms renovated through the classroom
initiative project. Click here for
list. |
Acad |
May 30 - June 20, 2006 |