Pr
# |
Building |
Project
Name |
Maintenance |
Seg |
|
1 |
Student
Housing |
Wood
frame Houses-various |
Install
GFI to code in houses where needed |
SLF-W |
|
2 |
Physical Plant |
CPP |
Replace
#2 boiler's soot blower (generating bank) with a unit from Diamond. |
Infra |
|
3 |
Student
Housing |
76
Lawn Ave. |
Repair/replace
front steps install rails to code |
SLF-W |
|
4 |
Student
Housing |
Wood
frame Houses-various |
Emergency
Sewer Repairs |
SLF-W |
|
5 |
Physical Plant |
Remove
5 tanks |
A
committed on-going project to pull all underground tanks |
Infra |
|
6 |
North College |
237 High St. |
Complete
replacement of fan coil units on 1st and 2nd floor. |
Admin |
|
7 |
Foss Hill Dorm
# 4 |
Replace
sewer lines |
Replace
old clay sewer lines from Foss 4 to Foss Drive manhole. |
SLF-D |
|
8 |
Substation |
Recabling |
High
voltage feeder from sub station to Butterfield needs replacement |
Infra |
|
9 |
CPP |
CPP |
Replace
4 steam isolation valves on steam line feeding the campus. |
Infra |
|
10 |
CPP |
CPP |
Clean
Firesides & watersides on #1 & #2 boilers. |
Infra |
|
11 |
South College |
229 High St. |
Renovate
existing single occupancy unisex ground floor bathroom and bring into ADA
compliance. |
Admin |
|
12 |
Butterfield A |
25 Lawn Ave. |
Replace
high voltage cabling between complexes. |
SLF-D |
|
13 |
Student
Housing |
44
Home Ave. |
Replace
roofing |
SLF-W |
|
14 |
Rental
Properties |
3
Brainerd Ave. |
Replace
oil
boiler |
RP |
|
15 |
Foss Hill Dorm
# 1 |
Transformers |
Replace
4160 to 208 step down transformers at Foss 1, 4 and 5 |
SLF-D |
|
16 |
CFA M - Zilkha
Gallery |
283 Washington
Terrace |
Install
Fire Alarm system |
Acad |
|
18 |
CPP |
CPP |
Repair
stacks |
Infra |
|
19 |
Student
Housing |
24
Fountain Ave. |
Repair
porches per code. Paint porch.. |
SLF-W |
|
20 |
Student
Housing |
48
Home Ave. |
Repair
porches per code. Paint entire house. |
SLF-W |
|
21 |
Student
Housing |
184
Washington ST.A+B |
Upgrade
electrical system to code. Renovate kitchen in unit 1A |
SLF-W |
|
22 |
CFA P -
Theater |
283 Washington
Terrace |
Existing
theater lighting (qty-69) contains asbestos in the lamps and cords.
Replace with current standard energy efficient instruments. |
Acad |
|
23 |
Judd Hall |
207 High St. |
Front
brownstone steps need to be reset. Column may be cracked, front brownstone
entrance requires structure re work |
Acad |
|
24 |
CFA -
Crowell Concert |
283 Washington
Terrace |
Install
Fire Alarm |
Acad |
|
25 |
CPP |
CPP |
Install
evaporative cooling to reduce temperatures in interior of space - required
for personal safety and to protect electronic equipment-
Cost of this work to be combined with CHEFA Chiller Project. |
Infra |
|
26 |
Science Tower |
265 Church St. |
Install
metering on primary electric system |
Acad |
|
27 |
Student
Housing |
240
Court Roof |
Replace
roof. Field observation by roofing contractor. |
SLF-W |
|
28 |
Student
Housing |
Wood
frame Houses-various |
Upgrade
interior lighting to code, and add wall switches in rooms where needed. |
SLF-W |
|
29 |
Student
Housing |
Wood
frame Houses |
Appliance
replacement-various locations |
SLF-W |
|
30 |
English
Department |
279
Court St. |
Lights
flicker, inspect wiring and repair.-To be perform
in-house, split load. |
Admin |
|
31 |
Judd Hall |
207 High St. |
Replace
dysfunctional fume hood on 4th floor |
Acad |
|
32 |
CFA L - Art
Workshop |
283 Washington
Terrace |
Install
Fire Alarm |
Acad |
|
33 |
CFA P -
Theater |
283 Washington
Terrace |
Repair
theater rigging per inspection report |
Acad |
|
34 |
CPP |
Boiler
Repairs |
#2
Boiler- remove outer casing and insulation to inspect for leaks. Repair
any leaks found. |
Infra |
|
35 |
Student
Housing |
151
Church St. |
Install
sprinkler system and upgrade alarm system if necessary. |
SLF-D |
|
36 |
Foss Hill Dorm
# 7 |
Hot
Water Tank |
Replace
hot water tank. Abatement is necessary. |
SLF-D |
|
37 |
Rental
Properties |
Various
Locations |
New
service is needed to replace old fuse panels and GFI's need to be
installed for code issues. |
RP |
|
38 |
Rental
Properties |
Replace
city sidewalk from 82 Lawn Ave to Pine St. |
Remove
dangerous walk, and pour a new concrete walk. Remove dead city trees. |
RP |
|
39 |
President’s
House |
Replace
sidewalk at High St. |
Replace
the uneven and broken stone with a tinted concrete for safety and
maintenance. High St. walk |
Admin |
|
41 |
Women’s
Studies |
287 High St. |
Install
emergency lighting in stairwells, exit signs, replace gutters &
downspouts, scrape& paint
building, shutters, doors, install window in basement, remove unused
weatherhead and conduit, install fire alarm system and smokeheads.
Asbestos abatement. |
Admin |
|
43 |
CAAS |
343 High St. |
Repair
and paint exterior of building (old section only-front). Upgrade
electrical. |
SLF |
|
44 |
Russell House
/ Honors |
359 High St. |
Upgrade
electrical to extension portion of Russell House to allow use of PCs and
a/c concurrently. |
Admin |
|
45 |
CFA Zilkha Gallery |
283 Washington
Terrace |
Replace
hydraulic cylinder |
Admin |
|
46 |
Student
Housing |
200
High St. |
Install
sprinkler system and upgrade alarm system if necessary. |
SLF-D |
|
47 |
Student
Housing |
162
Church St -1st floor |
Renovate
bathroom including plumbing and
electrical |
SLF-W |
|
48 |
Student
Housing |
44
Home Ave 2nd fl. |
Renovate
bathroom including plumbing and electrical |
SLF-W |
|
50 |
Physical Plant |
Remove
hemlocks around campus. |
Second
half of a phased project to remove all of the dead and dying trees. |
Infra |
|
51 |
Freeman
Athletic Center |
161 Cross St. |
Repair
brick accent walls, repoint. Repair walls by chemical room entrance. |
SLF-A |
|
52 |
North College |
237 High St. |
Complete
insulation of chilled water lines in basement. |
Admin |
|
53 |
Davison Art
Center |
301 High St. |
Vault
safety improvements. Install containment below pipes in vault |
Admin |
|
54 |
CPP |
CPP |
Insulation
of lines in man way #9 ( William St./Hamlin St.) |
Infra |
|
55 |
CPP |
CPP |
Clean
#1 & #2 Fuel Oil Tanks. |
Infra |
|
56 |
CFA F - Music
Studios |
283 Washington
Terrace |
Construct
steel access system from upper level of stair tower to roof hatch to
provide roof access. |
Acad |
|
57 |
Hall
Atwater/Shanklin Lab |
Electric
Metering |
Add
Electric Metering to Building |
Acad |
|
58 |
Student
Housing |
49
Home Ave. |
Repair
porches to code. Paint house. Includes body, trim, windows, doors,
porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be
provided by Owner. |
SLF-W |
|
59 |
Student
Housing |
73
Home Ave. |
Repair
porches per code. Paint entire house. |
SLF-W |
|
61 |
Student
Housing |
4
Warren St. |
Repair
porch per code, Paint |
SLF-W |
|
62 |
Student
Housing |
19
Fountain Ave. |
Replace
old roofing |
SLF-W |
|
63 |
Student
Housing |
30
Fountain Ave. |
Replace
old roofing |
SLF-W |
|
64 |
PAC/Harriman
Hall |
238 Church St. |
Basement
toilets overflow in heavy rainstorms.
Check for underground broken sewer line, etc.-Performed
by in-house |
Acad |
|
65 |
Rental
Properties |
329
Washington Terrace-Guest House |
Replace
electrical in entire guest house. |
RP |
|
66 |
Rental
Properties |
260
Pine St. |
Replace
sewer lines. |
RP |
|
67 |
Rental
Properties |
171
Mount Vernon |
Replace
sewer lines. |
RP |
|
68 |
Physical Plant |
Catch
Basins at High-rise and Foss Hill Dr. |
Repair
catch basins- materials are rotting, allowing the top to drop below the
surface. |
SLF-D |
|
69 |
South College |
229 High St. |
Clean
and repoint stone at entrance to South College |
Admin |
|
70 |
CFA C - World
Music |
283 Washington
Terrace |
Repair
roof pitch between skylights to eliminate leaks. Repair skylight gaskets
and seams. |
Acad |
|
71 |
Freeman
Athletic Center |
161 Cross St. |
Refurbish
steeplechase pit to updated safety specifications |
SLF-A |
|
72 |
CPP |
CPP |
Install
feed water pre-heater |
Infra |
|
73 |
CPP |
Campus
Wide |
Rebuild
steam and chilled water manhole in front of north college (MH #2). Install
new steam pump. |
Infra |
|
74 |
Student
Housing |
55
Home Ave. |
Repair
porches per code. Paint house. Includes body, trim, windows, doors,
porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be
provided by Owner. |
SLF-W |
|
75 |
Student
Housing |
72
Home Ave. |
Repair
porches to code. Paint entire house. |
SLF-W |
|
76 |
Student
Housing |
28
Lawn Ave. |
Repair
porches per code. Includes but not limited to decking, ceiling, rails,
steps, columns. Paint house. Includes body, trim, windows, doors, porches,
decks, enclosed porches, basement doors/hatchways.
Paint foundation if previously painted. Colors to be provided by
Owner. |
SLF-W |
|
77 |
PIMMS |
178
Cross St. |
(Install
fire alarm system, smoke detectors (to be performed during winter break)), upgrade electrical, repair conference
room wall and repair roof where water
is entering room.
|
Admin |
|
78 |
Science Tower |
265 Church St. |
Add
DDC controls to hallway lights for use of load shedding. |
Acad |
|
79 |
Student
Housing |
186
Cross St. |
Renovate
bathroom including plumbing and electrical |
SLF-W |
|
81 |
Student
Housing |
267
Court ST. A,B,C |
Replace
old roof. Renovate kitchen in unit #A. including plumbing and electrical |
SLF-W |
|
83 |
Rental
Properties |
160
Lincoln Street |
Replace
boiler. (Oil) |
RP |
|
84 |
Rental
Properties |
130
Mount Vernon |
Replace
boiler. (Oil) |
RP |
|
85 |
Downey House |
Replace
walk along High St. |
The
uneven stones should be replaced with a tinted concrete to provide a
stable surface for all of the traffic to and thru
this area.-To be performed by R. Schmidt w/
Humanities Villiage |
Admin |
|
86 |
Freeman
Athletic Center |
161 Cross St. |
Continue
the program of upgrading a field each year, to upgrade
the use, safety and integrity of the sports surfaces and greenscape
of the campus. |
SLF-A |
|
87 |
Freeman
Athletic Center |
161 Cross St. |
Repair
broken bricks, point to keep from freeze/thaw at semi-circle drive. |
SLF-A |
|
88 |
Freeman
Athletic Center |
161 Cross St. |
Rebuild
drainage area at chemical room entrance. Berm or install drain across
walk, trench to area drain. |
SLF-A |
|
89 |
CFA M - Zilkha
Gallery |
283 Washington
Terrace |
Repair/pave
walk and stairs from "T" lot, replace railing |
Acad |
|
90 |
CFA P -
Theater |
283 Washington
Terrace |
Examine
existing construction of mezzanine above costume shop for code compliance
and safety. |
Acad |
|
91 |
Wesleyan Press |
110
Mt. Vernon |
Replace
electrical service and recircuit building, upgrade heating system, Review
heating system, if cost <$3,000, perform work. Allowance for scope |
Admin |
|
92 |
Rental
Properties |
80
Lawn Avenue |
Replace
roof.-Moved above line by consensus |
RP |
|
93 |
Student
Housing |
24
Fountain Ave |
Renovate
bathroom including plumbing and electrical- |
SLF-W |
|
94 |
Student
Housing |
Wood
frame Houses-various |
Provide
and install lock system for the bedrooms of all wood frame houses.-Moved
above line by consensus. Initiate master key system on rooms that
currently have no lock. |
SLF-W |
|
95 |
PAC/Harriman
Hall |
238 Church St. |
Replace
floor coverings and make floor system watertight - install floor drains at
2nd floor restrooms-Moved above line by consensus due
to current need |
Acad |
|
96 |
Romance
Languages |
300 High St. |
Replace
slate roof, including all flashings and skylight over stairway-Moved
above line through reduction of contingency dollars. |
Admin |
|
97 |
Park
Washington |
256 Washington
St. |
Replace
hydraulic cylinder-Per HK, to be paid by Park Washington |
SLF-W |
|
98 |
Student
Housing |
211A
Pine St. |
Renovate
bathroom. Linoleum floor peeling, painted wallpaper peeling, paint chips
in tub. Ensure GFI. |
SLF-W |
|
100 |
Student
Housing |
135
High 2nd fl. |
Renovate
bathroom to code including plumbing and electrical |
SLF-W |
|
101 |
Student
Housing |
44
Home Ave |
Repair
or remove back porch |
SLF-W |
|
102 |
Malcolm X
House |
343 Washington
St. |
Install sprinkler system in residential area of facility. Upgrade fire alarm
system. Replace lounge floor, abatement required. |
SLF-D |
|
103 |
Student
Housing |
211A
Pine St. |
Renovate
kitchen including plumbing and electrical |
SLF-W |
|
104 |
Rental
Properties |
71
Lawn Ave. |
Replace
roof. |
RP |
|
105 |
Rental
Properties |
1
Long Lane |
Replace
sewer lines. |
RP |
|
106 |
Rental
Properties |
15
High Street |
Replace
sewer lines. |
RP |
|
107 |
Rental
Properties |
15
High Street |
Replace
boiler. (Oil) |
RP |
|
108 |
Physical Plant |
Level
sidewalks |
Hydro
level sunken areas of concrete walk to the level of the rest of the walk. |
Infra |
|
109 |
Science Tower |
265 Church St. |
Concrete
in areaway is delaminating and deteriorating, especially on structural
beams. Engineering and suggested remedial work will be performed.
Soil Borings performed. Redesign to be obtained. |
Acad |
|
110 |
Davison Art
Center |
301 High St. |
Replace
antique and dysfunctional A/C equip and install EMS |
Admin |
|
111 |
CFA P -
Theater |
283 Washington
Terrace |
Replace
rotted exit doors and frames in stair towers. Ensure proper reconnection
of Safe & Sound alarm system. |
Acad |
|
112 |
CFA P -
Theater |
283 Washington
Terrace |
Balance
HVAC system, clean coils repair/replace dampers, install DX cooling in
control booth |
Acad |
|
113 |
Judd Hall |
207 High St. |
Replace
pneumatic controls on air
handlers 2,3,4,5,6 and heating converters north and south. These control
the radiation in rooms 113, 116and Library also need to included. DDC
upgrade A/Cs |
Acad |
|
114 |
Student
Housing |
22
Lawn Paint House |
Paint
house. Includes body, trim, windows, doors, porches, decks, enclosed
porches, basement doors/hatchways.
Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W |
|
115 |
Student
Housing |
Fountain
Ave Sidewalk |
Repair
concrete sidewalk. Broken and raised. |
SLF-W |
|
116 |
In Town |
Units
1 - 5 |
Paint
interior, roof repair. |
SLF-D |
|
117 |
Student
Housing |
168
Cross St |
Renovate
bathroom including plumbing and electrical |
SLF-W |
|
118 |
Student
Housing |
171
Vine St A+B |
Renovate
bathroom including plumbing and electrical |
SLF-W |
|
119 |
Student
Housing |
207-A+B
Pine St. |
Repair
kitchens in both units including plumbing and electrical |
SLF-W |
|
121 |
Rental
Properties |
36
Mansfield Terrace |
Replace
gas boiler. |
RP |
|
122 |
Rental
Properties |
27
Brainerd Avenue |
Replace
boiler. (Oil) |
RP |
|
125 |
Foss Hill Dorm
# 1 |
Fused
cut-out |
Replace
existing oil fused cut-outs |
SLF-D |
|
126 |
Freeman
Athletic Center |
161 Cross St. |
Inspect
and repair grout on the main deck area of Natatorium. |
SLF-A |
|
127 |
Univ.
Relations & Dev. |
318
High Street |
Front
of foundation wall concrete façade finish over is cracked off on corner
and front face is showing signs of cracking also. |
SLF-W |
|
128 |
CFA M - Zilkha
Gallery |
283 Washington
Terrace |
Per
architect's recommendations, this is phase 1 of a
multi-year project for Gallery renovations. |
Admin |
|
129 |
Physical Plant |
56
Hamlin Street |
Complete
replacement of double hung windows started in 02/03 |
Infra |
|
130 |
CPP |
CPP |
New
Draft control unit for the Cleaver Brooks boiler #3. |
Infra |
|
131 |
Guest House |
327 High St. |
Rebuild
entrance elevation to prevent ponding water and provide proper drainage. |
Admin |
|
133 |
Student
Housing |
76
Lawn Paint House |
Paint
house. Includes body, trim, windows, doors, porches, decks, enclosed
porches, basement doors/hatchways.
Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W |
|
134 |
William Street
High Rise |
William St. |
Modernize
control system and doors |
SLF-D |
|
166 |
Student
Housing |
CAMPUS
- Trash Cans |
Install
30 trash cans at strategic locations throughout campus (Coordinate
type with Campus Master Plan) In Progress |
SLF-W |
|
187 |
Freeman
Athletic Center |
161 Cross St. |
Replace
the divider curtain system in Bacon Field House with mechanical
system. |
SLF-A |
|
203 |
Olin Library |
252 Church St. |
Install
new light posts on Church Street & Clark Hall elevations to better
illuminate the stairways and drives. (Coordinate type
with Campus Master Plan) |
Acad |
|
258 |
Science Tower |
265 Church St. |
Rekey
Science Center including library, excluding Hall Atwater & Shanklin |
Acad |
|
259 |
Olin Library |
252 Church St. |
Replace
curtains in Smith Reading Room, 20 years old |
Acad |
|
271 |
Olin Library |
252 Church St. |
Replace
flooring in connector between Olin and PAC |
Acad |
|
291 |
Anthropology
Dept. |
281 High St. |
Replace
vinyl stair treads on front foyer stairs. Remove chalkboard from Prof.
Sharma's office, paint wall. |
Acad |