Project Manager: Roseann Sillasen
2022 Summer Construction Location Map (interactive)
2022 Summer Construction Location Map (static)
Capital & MM FY23 Projects - Construction Completed Summer 2022
___________________________________________________________________________________________________________________
Work performed and completed Summer/Fall 2020 & Summer/Fall 2021
-Capital & MM FY21 Projects - Construction Completed Summer 2020
-Capital & MM FY22 Projects - Construction Completed Summer 2021
___________________________________________________________________________________________________________________
Lien Waiver Links: 
| 
 | Building Name | Address | Description of Work | 
| SLF | Clark Hall - Area Coordinator Apartment | 268 Church Street | Carpet Replacement | 
| ACAD | Schonberg Dance Studio | 247 Pine Street | Reinforce Walls w/ acruvyn panels. Construct new all gender bathroom in lobby. | 
| ACAD | Exley Science Center | 265 Church Street | Restore Lavatories/new toilet paritions (1st flr mens/2nd flr M/W, 5th flr M/W) | 
| SLF | Student WF | 11 Vine Street | Replace Windows | 
| SLF | The Bayit | 157 Church Street | Kitchen Renovation with Flooring & Lighting | 
| SLF | Student WF | 162 A/B/C Church Street | Kitchen Renovation/ Bathroom Renovation / Window Replacement / Exterior Paint | 
| SLF | Russian House | 163 High Street | Kitchen Renovation / Lighting | 
| SLF | Undergrad Woodframe | 227 Pine Street | Kitchen Renovation / Lighting | 
| SLF | Student WF | 38/40 Brainaerd Avenue | Bathroom Renovations | 
| ACAD | Zilkha Gallery | 283 Washington Terrace | Window film, UV protection (In review) | 
| ACAD | Russell House | 350 High Street | Paint Exterior | 
| SLF | Non Traditional Dorm | 200 High Street | Install New Wood Floors/Vinyl Tile | 
| SLF | Undergrad Woodframe | 15 Fountain Avenue | Kitchen Flooring/New Electrical Service/Lighting | 
| ATH | Bacon Fieldhouse | 161 Cross Street | South Elevation exterior wall repairs/paint | 
| SLF | Undergrad Woodframe | 47 Brainerd Avenue | Window Replacement / Vinyl siding | 
| SLF | Dormitory | Butterfield Complex | Window Treatment Replacement | 
| SLF | Dormitory | Foss Hill 7 and Foss Hill 6 | Flooring Replacement; Foss 7-1st, 2nd & 3rd floors. Foss 6-basement level | 
| SLF | Undergrad Woodframe | 18 Brainerd Avenue | Kitchen Renovation | 
| SLF | Undergrad Woodframe | 59 A/B Home Avenue | Kitchen counters and flooring replacement & Bathroom flooring | 
| SLF | Undergrad Woodframe | 131 Cross Street | Kitchen & Bathroom Renovation | 
| SLF | Undergrad Woodframe | 48 Home Avenue | Kitchen Renovation / Window Replacement | 
| ACAD | Fisk Hall | 262 High Street | 4th Floor Corridor Flooring / Paint | 
| ATH | Freeman Athletic Center | 161 Cross St | Athletic Training Room – Epoxy flooring installation | 
| ATH | Freeman Athletic Center | 161 Cross St | Natatorium- Interior Restoration / construct all gender bathroom | 
| SLF | Undergrad Woodframe | 148 Church St | Exterior Paint/carpentry repairs | 
| ADM | North/South College | High St | Install pavers at open connector | 
| SLF | Undergrad Woodframes | various | 1st floor structural reinforcement | 
| SLF | Undergrad Woodframe | 42 Miles Ave | Bathroom floor replacement | 
| SLF | Undergrad Woodframe | 59 Pearl St | Flooring replacements / lighting | 
| Adm | 291 Main St | 291 Main St | Fire Alarm upgrade | 
| ACAD | CFA Art Studio North | 289 Washington St | Door restoration in Art Studio 101 | 
| ACAD | Olin Library | 252 Church St | 3rd floor carpet replacement (Fall) | 
| SLF | Clark Hall | 268 Church St | Common Area seating upholstrey replacement (Fall) | 
| ACAD | CFA World Music Hall | 40 Wyllys Ave | Lower level-new carpet | 
| ACAD | Classrooms | various | Furniture replacements | 
| 
 | Building | Address | Description of Work | 
| SLF | Foss Hill 5 roof replacement | 57 Foss Hill Drive | Roof Replacement | 
| SLF | Butterfield B Pod 3 roof replacement | 20 Huber Avenue | Roof Replacement | 
| SLF | Bennet Hall asphalt roof | 35 Foss Hill Drive | Roof Replacement | 
| ATH | Freeman Athletic Center Natatorium roof replacement and new roof hatches | 161 Cross Street | Roof Replacement | 
| SLF | Resource Center & Office of Religious Studies | 167/169 High Street | Roof Replacement | 
| ADM | Davison Art Center/Alsop House | 301 High Street | Built In Gutter Repairs north elevation | 
| SLF | Bayit | 157 High Street | Cut in New Parapet Scupper | 
________________________________________________________________________________________________________________
AR=Alan Rubacha arubacha@wesleyan.edu
ACAD=Academic Admin=Administrative Infra=Infrastructure RP=Rental Properties SLF=Student Life Facilities SLF-WF=Student Life Facilities-Woodframes ATH=Athletics
CPP=Central Power Plant AAF=Academic & Administrative Affairs MH=Manhole DDC=Direct Digital Controls GFI=Ground Fault Interrupt SW=southwest ADA=Americans with Disabilities Act